Weather
Nor'Easter Disrupts Thanksgiving In Bucks With Strong Winds, Power Outages
PECO reported that crews had restored service to more than 150,000 customers by midnight throughout the Philadelphia area.

BUCKS COUNTY, PA — Strong winds and rain from a strong Nor'Easter pelted Bucks County on Thanksgiving, making for dicey holiday travel with numerous reports of downed trees and power outages.
At the height of the storm, first responders in Bucks County reported numerous trees and branches on roadways, downed power lines and sporadic outages, plunging some Thanksgiving dinners into the dark and interrupting football-viewing plans.
In Lower Makefield and Newtown Township, power outages knocked out traffic signals along portions of the Newtown Bypass. And in Doylestown Township, a tree fell across wires, closing New Britain Road between Butler Avenue and Lower State Road.
Find out what's happening in Doylestownfor free with the latest updates from Patch.
On Friday morning, several roadways were still closed, including Keystone Drive in Hilltown Township between Church Road and Fairhill Road. County Line Road in Hilltown was also closed between Bethlehem Pike and East Cherry Lane.
Heavy rain saturated the ground throughout the day, making it easier for trees and large limbs to fall into power lines and electrical equipment and causing widespread damage to poles, wires, and other equipment across southeastern Pennsylvania.
Find out what's happening in Doylestownfor free with the latest updates from Patch.
As of Friday morning, FirstEnergy is reporting 1,776 of its Bucks County customers are without power in Tinicum, Bridgeton, Nockamixon and Durham townships and Riegelsville Borough.
As of 10 a.m. Friday morning, PECO reports that power has been restored in much of its Bucks County service area.
According to PECO, 118 outages were still being reported, with 59 outages in Buckingham, 60 in Bristol Borough, 76 in Bensalem, and five in Bedminster.
According to PECO, even with sustained winds that limited some work for safety reasons, crews were able to restore service to more than 150,000 customers in the Philadelphia area by midnight on Thursday and continued working overnight to restore power.
In advance of the storm, PECO activated its Emergency Response Organization, increased field and back-office staffing, and secured contractors and mutual assistance resources before and during the event.
Mutual assistance crews from Canada to Tennessee and Florida responded to the region to supplement PECO crews and local contractors, with additional crews continuing to arrive Friday and into the weekend.